| 50% down payment due upon placing an order. Total balance due upon order landing in Los Angeles. |
| Lead times begin once design and shop drawings are signed off. |
| For COM/COL orders the lead time begins once the last fabric is received by our manufactures. |
| Client is responsible for shipping from Port of Los Angeles to the final destination. Faustine may assist in sourcing shipping methods if requested. |